Acta Mechanica Slovaca 2019, 23(1):38-43 | DOI: 10.21496/ams.2019.005

Simulation Model Creation for Verifying the Production Capacity of a Production Line and Sizing in-Process Inventory

Peter Trebuna1, Miriam Pekarcikova1, Marek Kliment1
1 Technical University of Kosice, Faculty of mechanical engineering, Institute of management, industrial and digital engineering, Park Komenskeho 9, 040 01 Kosice, Slovakia

The high complexity of logistical systems in connection with the high competitive pressure makes the implementation of efficient processes in companies and supply chains inevitable. Unlike the optimization in which an attempt is made to model a problem directly, analytically or through modelling using heuristic, the simulation tracks another, i.e. intuitive approach. The development of information technology has created the need to apply a comprehensive system of technical data management in industrial practice. It was necessary to increase the efficiency of information sharing within the value-added chain of the company on specific projects. The aim of this paper is to create a model of production disposition with material flow simulation in TX Plant Simulation software environment for verifying the maximal potential capacity of production.

Keywords: model, simulation, production, PLM, TX Plant Simulation.

Published: March 29, 2019  Show citation

ACS AIP APA ASA Harvard Chicago Chicago Notes IEEE ISO690 MLA NLM Turabian Vancouver
Trebuna, P., Pekarcikova, M., & Kliment, M. (2019). Simulation Model Creation for Verifying the Production Capacity of a Production Line and Sizing in-Process Inventory. Acta Mechanica Slovaca23(1), 38-43. doi: 10.21496/ams.2019.005
Download citation

References

  1. Bangsaw, S. (2015). Tecnomatix Plant Simulation: Modeling and Programming by Means of Examples, Springer, Switzerland. Go to original source...
  2. Bangsaw, S. (2010). Manufacturing Simulation with Plant simulation and SimTalk: Usage and Programming with Examples and Solutions, Springer-Verlag Berlin Heidelberg. Go to original source...
  3. Lehocká, D., Hlavatý, I., Hloch, S. (2016). Rationalization of material flow in production of semitrailer frame for automotive industry. Technical Gazette, Vol. 23, No. 4, 1215-1220, doi:10.17559/TV-20131113100109. Go to original source...
  4. Krajcovic, M., Plinta, D. (2012). Comprehensive approach to the inventory control system improvement. Management and Production Engineering Review, 2012. Vol. 3, Issue 3, ISSN 2082-1344, 34-44.
  5. Centobelli, P., Cerchione, R., Murino, T., Gallo, M. (2016). Layout and material flow optimization in digital factory. International Journal of Simulation Modelling, Vol. 15, No. 2, 223- 235, doi:10.2507/IJSIMM15(2)3.327. Go to original source...
  6. Badida, M., Gombar, M., Maslejova, A., Sobotova, L., Kmec, J., Vagaska, A. (2015). Evaluation of zinc coating quality by statistical methods. Przemysl Chemiczny. Vol. 94, No. 12, 2146-2149, doi.:10.15199/62.2015.12.11. Go to original source...
  7. Trebuna, P., Markovic, J., Kliment, M., Halcinová, J. (2015). Modeling in Industrial Engineering. TU Kosice, 1st edition, Kosice.
  8. Straka, M. (2010). Alfa, a.s. distribution logistics system. Acta Montanistica Slovaca, Vol. 15, No. 1, 34-43.
  9. Straka, M.; Malindzak, D. (2009). Algorithms of capacity balancing of printing machineries for Alfa Foils, a.s. planning system. Acta Montanistica Slovaca, Vol. 14, No. 1, 98-102.
  10. Rosova, A. (2010). The system of indicators of distribution logistics, transport logistics and material flow as a tool of controlling in logistics enterprise. Acta Montanistica Slovaca, Vol. 15, No. 1, 67-72.
  11. Tecnomatix, from http://www.sova.sk/sk/produkty/tecnomatix, accessed on 16-02-2019.
  12. Lenort, R., Stas, D., Samolejova, A. (2012). Heuristic Algorithm for Planning and Scheduling of Forged Pieces Heat Treatment. Metalurgija, Vol. 51, No. 2, 225-228.
  13. Gregor, M., Hodon, R., Biňasová, V., Dulina, Ľ., Gašo, M. (2018). Design of Simulation-Emulation Logistics System. Modern Machinery Science Journal, 2498-2502, ISSN 1803- 1269. Go to original source...
  14. Ottova, M., Kudrna, J., Poor, P., Edl, M. (2015). New Possibilities of Knowledge Transfer by Playing Manager Games. Procedia - Social And Behavioral Sciences, Vol. 174, 3738-3742, doi: 10.1016/j.sbspro.2015.01.1107. Go to original source...
  15. Gregor, T., Krajcovic, M., Wiecek, D. (2017) Smart Connected Logistics. In Procedia Engineering, Vol. 192, Transcom 2017 12th International Scientific Conference of Young Scientists on Sustainable, Modern and Safe Transport. High Tatras, Grand Hotel Bellevue, Slovakia, 265-270, ISSN 1877 7058. Go to original source...
  16. Saniuk, S., Samolejova, A., Saniuk, A., Lenort, R.(2015). Benefits and barriers of participation in production networks in a metallurgical cluster - research results. Metalurgija, Vol. 54, No. 3, 567-570.
  17. Klos, S., Patalas-Maliszewska, J. (2013) The impact of ERP on maintenance management. Management and Production Engineering Review, Vol. 4, No. 3, 15-25. Go to original source...
  18. Fiľo, M., Markovič, J., Kliment, M., Trebuňa, P. (2013) PLM systems and Tecnomatix Plant Simulation, a description of the environment, control elements, creation simulations and models. American Journal of Mechanical Engineering, Vol. 1, No. 7, 165-168. - ISSN 2328-4102
  19. Trebuňa, P., Pekarčíková, M., Kronová, J. (2018) Automation of the casting process by the use of simulation software. Management and Production Engineering Review. Vol. 9, No. 1 82-89, ISSN 2082-1344

This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, distribution, and reproduction in any medium, provided the original publication is properly cited. No use, distribution or reproduction is permitted which does not comply with these terms.